HNARL Genie GS-2668 GS-3268 Z-30-20N 48v Genie DC Motor Controller 23314GT 23314 GE-2331436V / 48V DC Motor Controller |
Parts No: | 23314GT |
Used for : | GS-2668 DC Z-30/20 Z-30/20N Z-34/22 DC Z-34/22N |
Packing Specifications: |
Length (mm) | 180 |
Width (mm) | 140 |
Height (mm) | 80 |
Weight (kg) | 2.2 |
-Genie GS-2668 DC Z-30/20 Z-30/20N Z-34/22 DC Z-34/22N -GS-2668 DC (from serial number 101 to 41317)-->300 Chassis Components -GS-2668 DC (from serial number GS-68-41318 to GS68-41998 and from GS6803-41999 to GS6811-53419)-->300 Chassis Components -GS-3268 DC (from serial number 101 to 41317)-->300 Chassis Components -GS-3268 DC (from serial number GS-68-41318 to GS68-41998 and from GS6803-41999 to GS6811-53419)-->300 Chassis Components -Z-30/20 Standard (from serial number 3090-2214 to Z30-4506)-->200 Drive Chassis Module -Z-30/20N (from serial number 00001 to 1931)-->200 Drive Chassis Components -Z-30/20N (from serial number 01932 to 15132)-->200 Chassis Components -Z-34/22 DC (from serial number 0001 to 1734)-->200 Drive Chassis -Z-34/22N (from serial number 0001 to 2226)-->200 Drive Chassis
Product Delivery | Shipping Time | Start & End | Descriptions |
By Express. DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect | 3-8 working days | Door to Door | For Small order, Sample order, Trial order Fast & Convenient |
Air Transportation By Plane | 5-10 working days | Door to Airport | For Medium order Fast & Cheaper than express The consignee needs to take delivery at the airport |
Sea Transportation By Vessel | 20-45 days | Door to Seaport | For Mass order Cheap but take time The consignee needs to take delivery at the seaport |
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.